The FMS

PROJECT PORTFOLIO

cat image
Research Laboratories
Perhaps the most serious consequences of interference from all forms of EMF are those which occur in medical laboratories and hospitals.
cat image
Medical Facilities
Perhaps the most serious consequences of interference from all forms of EMF are those which occur in medical laboratories and hospitals.
cat image
Educational Facilities
To mitigate EMI threat concerns, FMS designed and implemented multiple special magnetic field shielding schemes to lower EMF levels to acceptable, non EMI threat levels.
cat image
Transportation
Increasingly, the intersection of urban planning/mass transit, high-density research environments, and energy-efficient building designs and the emerging
cat image
Government
To ensure a low electromagnetic environment, FMS was engaged by the design team to conduct a thorough assessment of the BRC building’s design for EMI interference concerns.
cat image
Commercial
Virtually all commercial buildings have areas with elevated AC (60 Hz – power frequency) magnetic fields which can cause interference problems with sensitive electronic equipment

PAST FMS PROJECTS

UCI – IMRI
University of California Irvine - Irvine Materials Research Institute

FMS as the EMF/EMI Consultant designed and installed the passive and active mitigation systems for this newly established interdisciplinary organization under the Office of Research of the University of California Irvine (UCI) to house state of the art electron-microscope labs (4 imaging cells). The project required analysis of interference potential of all internal and external emission sources, which included vehicle and facility elevators (DC), broadband electrical system (AC) sources, etc.

Harvard LISE
Harvard University – LISE – Center for Nanoscale Systems (CNS) Project

FMS was engaged as the project’s EMI Consultant by the project architect (Wilson Architects) to conduct an electromagnetic field (EMF) analysis in an existing laboratory (shell space) located in the basement level of the Harvard CNS facility.

CURE
Seattle Children's Research Institute - Building CURE Project

Seattle Children’s Research Institute is currently in the construction phase of ”Building Cure”, a 540,000 square foot research building, which will be dedicated to developing therapies for children with diseases such as Cancer, Type 1 Diabetes and Sickle Cell Anemia.

Un. of Illinois Urbana-Champaign Electrical and Computer Engineering Bldg.
University of Illinois Urbana-Champaign (ECE) Building Project:

FMS was engaged to conduct a thorough assessment of the building’s design for EMI interference threat concerns to sensitive research equipment. A document review and extensive 3-Dimension computer simulation studies were conducted to evaluate EMF emissions from the building’s electrical distribution, mechanical and other systems.

FMS EXPERIENCE

Over its 20 years, FMS has successfully completed hundreds of EMI projects which included a diverse range of consulting and mitigation services.

Take a look at a list of the markets we serve »