Joel is an experienced professional with 20+ years of experience in electromagnetic engineering. Joel has been involved in the development of hardware and software for electromagnetic and vibration measurement equipment. He has also been involved in the development of magnetic active cancelation systems used in the mitigation of EMI disturbances to MRI and electron microscopy equipment. Joel has served as an EMI and RFI consultant on dozens of projects for medical, industrial, and research applications. Joel has provided consulting and engineering services on a wide spectrum of sources from DC static fields to low frequency/quasi-DC to radio frequencies. He is skilled at developing creative solutions to meet owner and project requirements while working with multi-disciplined groups.
BSEE – University Wisconsin – Madison
CBA – University of Illinois – Chicago
MBA – Keller School of Management
FMS as the EMF/EMI Consultant designed and installed the passive and active mitigation systems for this newly established interdisciplinary organization under the Office of Research of the University of California Irvine (UCI) to house state of the art electron-microscope labs (4 imaging cells). The project required analysis of interference potential of all internal and external emission sources, which included vehicle and facility elevators (DC), broadband electrical system (AC) sources, etc.
FMS was engaged as the project’s EMI Consultant by the project architect (Wilson Architects) to conduct an electromagnetic field (EMF) analysis in an existing laboratory (shell space) located in the basement level of the Harvard CNS facility.
Seattle Children’s Research Institute is currently in the construction phase of ”Building Cure”, a 540,000 square foot research building, which will be dedicated to developing therapies for children with diseases such as Cancer, Type 1 Diabetes and Sickle Cell Anemia.
FMS was engaged to conduct a thorough assessment of the building’s design for EMI interference threat concerns to sensitive research equipment. A document review and extensive 3-Dimension computer simulation studies were conducted to evaluate EMF emissions from the building’s electrical distribution, mechanical and other systems.
Over its 20 years, FMS has successfully completed hundreds of EMI projects which included a diverse range of consulting and mitigation services.
Take a look at a list of the markets we serve »