Learn about our world class

Contact Us

Recent Projects

National Renewable Energy Laboratory

As the EMI Consultant, FMS performed an assessment of the potential for large power distribution systems to impact the operations of sensitive imaging tools and other susceptible electronic equipment.

Toronto Sick Kids

Field Management Services, Inc. performed EMI surveys for the siting of an intra-operative MRI to be shared between two operating suites.

Un. of Illinois Urbana-Champaign Electrical and Computer Engineering Bldg.

FMS was engaged to conduct a thorough assessment of the building’s design for EMI interference threat concerns to sensitive research equipment. A document review and extensive 3-Dimension computer simulation studies were conducted to evaluate EMF emissions from the building’s electrical distribution, mechanical and other systems.

FMS EXPERIENCE

Over its 20 years, FMS has successfully completed hundreds of EMI projects which included a diverse range of consulting and mitigation services.

Take a look at a list of the markets we serve »