Learn about our world class

The FMS Advantage

FMS is a unique EMF/EMI/RFI/HEMP solution provider, known for our consultative and collaborative approach, providing creative and cost effective mitigation designs with 100% on-time planning and on-budget installations, and above all, a 100% record of meeting performance specifications.

FMS achieves effective EMF/EMI/RFI mitigation through creative and restrained use of technologies, many of which are low-tech and inexpensive. FMS holds US patents for shielding magnetic fields, and has pioneered innovation in EMI processes and materials.

For Example:

  • FMS was the first to introduce low-cost, high performance aluminum shielding for Electromagnetic Interference mitigation
  • After an extensive EMI threat risk assessment for a major research lab project, FMS recommended changes to a prior mitigation design, which resulted in more than $500K savings
  • FMS’ recommendation to eliminate excessive shielding previously recommended to a commercial office building, reduced overall project cost by $250K
  • During the design phase of a research laboratory, FMS’ simulation studies demonstrated that the magnetic field environment could be significantly reduced by relatively minor changes in conduit routing, thereby eliminating shielding in some areas and significantly reducing shielding in others
  • FMS, acting as Consultant and Project Manager for a research laboratory, eliminated the huge, unacceptable cost of shielding a group of cryo-magnets (up to 14 Tesla) by redesigning the magnets, with supplementary consultation with the magnetic manufacturer. The DC magnetic fringe field levels were reduced from 5,000 mG to <1 mG, saving the customer an estimated $26 million in shielding.

The FMS Advantage is our clients’ advantage. We collaborate with clients to engineer the best performing spaces for their purpose. We listen. As a result, we provide the lowest cost effective mitigation solution options, presented in a context which reflects our clients’ decisions on options best suited to their situation and project budget.

Recent Projects

Network Operations Center

This Internet Gateway facility in Dublin, Ireland houses a telecommunications hub that has full on-line uninterruptible power supplies.

ANL- APCF

The Advanced Protein Characterization (APCF) facility is a 50,000 GSF, 34.5 Million dollar project that was designed to house cutting edge laboratories for the most advanced protein science

Harvard University – LISE Project

Designed by the celebrated Spanish architect Rafael Moneo, the 135,000-square-foot structure known as the Laboratory for Integrated Science and Engineering

FMS EXPERIENCE

Over its 20 years, FMS has successfully completed hundreds of EMI projects which included a diverse range of consulting and mitigation services.

Take a look at a list of the markets we serve »